Diary of a rail fan in Kansai,Japan(Ver.2)

About world's rail news, general news, my train pictures, and travel diary)

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License. クリエイティブ・コモンズ 表示 - 非営利 - 改変禁止 4.0 国際 ライセンスの下に提供されています。

List of my travel diary My train photoes The other contents

Estimated opening year of the extension of Hokkaido Shinkansen to Sapporo is pushed back from 2030 to "Unknown"

北海道新幹線の札幌延伸開業、2030年度末から「未定」へ 小樽―長万部間の並行在来線廃止も「未定」?
Estimated opening year of the extension of Hokkaido Shinkansen to Sapporo is pushed back from 2030 to "Unknown",
which means that abolishment of the existing conventional line between Otaru and Oshamanbe is also "Unknown"
https://news.yahoo.co.jp/expert/articles/b2d4c596ff79a76595508471024b391eb355df54

(Translation begins)
According to the local news paper, JRTT and the ministry of land and transportation are ready to announce giving up of the opening of the section between Sapporo and Shin-Hakodate-Hokuto, which is under construction next week. Opening year will not be announced. Then, extension of Hokkaido Shinkansen is "pending".

Last Autumn, it was revealed that construction is halted due to huge hard rocks found in the Hirafu section in Youtei Tunnel between Kucchan and Niseko in Shiribeshi Subprefecture. Construction was restarted though, the completion year is 4 years behind the schedule. Furthermore, they have difficulty to tackle with soft ground in Oshima Tunnel between Yakumo and Hokuto in Oshima Subprefecture.

Effects on the construction are not only above things but also below things.
Rapidus Plant under construction in Chitose City is expected to lure more human resources to build the Shinkansen.
The other factor is that more strict upper limit of overtime work is enforced from 2024. Lack of human resources needed for building viaducts and electric hardware stations is expected.

Future use of the paralleling conventional railways have not yet been decided. Association led by Hokkaido Prefectural Authority agreed with abolishment of the section between Otaru and Oshamanbe, and abolishment of passenger service between Oshamanbe and Hakodate to make it dedicated to freight train.
But, the section between Otaru and Oshamanbe includes the congested section between Yoichi and Otaru with more than 2000 passengers per day. Due to serious shortage of bus drivers, local bus company showed concern to undertake bus service for abolished section.

During the vacation season in winter, some trains were operated with 3 cars, instead of the usual 2 cars, bacause of the crowd of foreign tourists.
This situation will make it more difficult to abolish the section.

On the other hand, the section between Oshamanbe and Hakodate is the main route of the freight trains connecting Honshu(Main Island of Japan) and Hokkaido. Abolishment of the section means extermination of the freight trains, which can cause skyrocketing price of vegetables around the greater Tokyo. Despite the fact, No one has decided who operates the section after extension of Hokkaido Shinkansen to Sapporo. Furthermore, the abolishment of the passenger trains between Oshamanbe and Hakodate will make it more difficult to prepare bus drivers for alternative buses, due to shortage of the bus drivers. The issue is similar to the case of the section between Otaru and Oshamanbe.

There are tons of the issues that should be solved like the plan of through service of Hokkaido Shinkansen to Hakodate Station. But, this announcement gives us more time to think about the issue including abolishment of the existing conventional lines.
(Translation ends)

The next opening of Shinkansen(High speed rail) will be more than 10 years later, due to this announcement.

Tokaido Shinkansen installs 2 compartment rooms on each N700S series train in 2026

東海道新幹線、2026年度に個室を導入 N700Sに2室
Tokaido Shinkansen installs 2 compartment rooms on each N700S series train in 2026
https://www.traicy.com/posts/20240417296412/

(Translation begins)
JR Central is going to install compartment rooms in 2026.
Complete compartment seats with higher privacy and security is going to be installed on some of the N700S series trains. Wi-Fi service, reclining seats with leg rest, individually adjustable lightening, air-conditioning, announcement will also be installed. 2 rooms per one trainset will be installed.
Fee and operated section will be announced later separately.

This installation is dedicated to business persons who want to have a meeting without concern, and passengers who prioritize privacy and relaxing without paying attention to surrounding people
(Translation ends)

In Japan, installation of luxurious seats seem to be not only common among commuter rails but also among high speed trains.

Test running of electric train on Caltrain started

CALTRAIN, BALFOUR BEATTY AND PG&E CELEBRATE MAJOR MILESTONE OF ELECTRIFICATION PROJECT
https://railway-usa.com/news/79622-caltrain,-balfour-beatty-and-pg-e-celebrate-major-milestone-of-electrification-project-with-successful-energization-and-testing-of-full-51-mile-caltrain-corridor

Electrification of the Caltrain is important not only for Caltrain itself, but also for California High Speed Rail, because the latter shares the same track with the former railway.
But, considering the speed and frequency of Caltrain, it must be difficult to make both of the trains run on the same track.

Seoul Station train collision involving KTX, 287 passengers transferred

Seoul Station train collision involving KTX, 287 passengers transferred
https://koreajoongangdaily.joins.com/news/2024-04-18/national/socialAffairs/Train-collision-at-Seoul-Station-involving-KTX-bullet-train-minor-injuries-reported-/2028329

The investigation of the root cause should be focused on if the ATS system(Automatic Train Stopping System) worked correctly or not.
Judging from the image on the article, Mugunghwa train crashed into KTX with slow speed. So, if the system had worked correctly, this accident could not have happened.

JR Hokkaido begins operation of red star train and blue star train around spring in 2026

JR北海道、豪華観光列車「赤い星」「青い星」 26年春運行開始
JR Hokkaido begins operation of red star train and blue star train around spring in 2026
https://www.watch.impress.co.jp/docs/news/1585116.html

(Summary begins)
JR Hokkaido begins "Star Train Plan".
Since existing sightseeing trains are becoming obsolete, the company tries to produce red star train and blue star train, both of which were designed by Eiji Mitooka.

The train will be renovated kiha 143 series train. Red Star will be defined as luxurious train and Blue Star will be defined as premium train. Renovation cost is estimated to be 1.8 billion JPY.

Interior of the red star train will include luxurious class seats, compartment seats, semi-compartment seats, box seats, lounge, tea room, and observation room. The official capacity is 100 persons.
The blue star train will include luxurious class seats, observation room, baggage shelf, baggage space. The official capacity is 200 persons. The red star will be operated on Senmou Line and the blue star will be on Furano Line.
(Summary ends)

Tobu Railway announced the installation of new train 80000 series

東武野田線に新型車両導入へ!外観イメージ明らかに「5両編成」で登場
New train will be installed on Tobu Noda Line. Exterior of the train will be brighter than current trains. Each train will consists of 5 cars
https://news.yahoo.co.jp/articles/d6c451bad906611c66f56c057d183e4bf1b363bd

(Translation begins)
Tobu Railway announced the installation of new train 80000 series, which consists of 5 cars, on Tobu Noda Line(Urban Park Line) on April 16.
The train consists of 5 cars, instead of the current 6 cars. Consumption of electricity will be reduced by 40%, compared with the current 8000 series train. Tano-seat(Enjoyable seat) will be launched to let children and family enjoy while they are riding.
25 trainsets will be installed. 18 trainsets out of 25 will be produced as 4 cars train. By adding 1 car from 60000 series train, it will be 5 cars.
Installation season will be spring in 2025.
(Translation ends)

It's rare to see installation of the new train by combining the existing train with newly produced train.

More Metro Manila Subway loans agreed

More Metro Manila Subway loans agreed
https://www.railwaygazette.com/metros/more-metro-manila-subway-loans-agreed/66345.article

The section between Roosevelt and North Avenue has been still pending.
It remains the same as the current status at least since I went to Manila 12 years ago.

But, I didn't know the plan about M7 Line and M9 Line.